Violation Detail
Standard Cited: 19100333 B02 IV B Selection and use of work practices
Inspection Nr: 1803749.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $14,895.00
Current Penalty: $0.00
Issuance Date: 08/05/2025
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/29/2025
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order: 10/01/2025
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/01/2025 | $0.00 | 08/29/2025 | Serious | |
Penalty | Z: Issued | 08/05/2025 | $14,895.00 | 08/29/2025 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.333(b)(2)(iv)(B):Before circuits or equipment was worked as deenergized, a qualified person did not use test equipment to test the circuit elements and electrical parts of equipment to which employees would be exposed and did not verify that the circuit elements and equipment parts are deenergized. On or about February 08, 2025, the employer did not ensure that a qualified employee performed testing to confirm the electrical circuit elements were effectively deenergized at the NW, NE, SW and New Building substations prior to preforming maintenance and/or testing.