Violation Detail
Standard Cited: 19100333 B02 II A Selection and use of work practices
Inspection Nr: 1733707.015
Citation: 01002B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/25/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/30/2024
Gravity: 5
Report ID: 0627510
Contest Date:
Final Order: 07/29/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/29/2024 | $0.00 | 08/30/2024 | Other | |
| Penalty | Z: Issued | 06/25/2024 | $0.00 | 07/17/2024 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.333(b)(2)(ii)(A):Safe procedures for deenergizing circuits and equipment were not determined before circuits or equipment are deenergized. On or about the 4th of March 2024, in Roscoe Wind Turbine 169, the employer did not ensure employees were provided procedures for deenergizing component(s) in and around gearbox prior to starting task.