Standard Cited: 19100147 C04 II D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1712464.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/10/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/28/2024
Gravity: 10
Report ID: 0112600
Contest Date:
Final Order: 05/03/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 04/10/2024 | $0.00 | 05/28/2024 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.147(c)(4)(ii)(D):The energy control procedures did not clearly and specifically outline the requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control: 38 Jackson Rd, Devens, MA: On and before October 24, 2023, employees utilized the Water For Injection 831 draft energy control procedure (ECP) that did not include any specific requirements to perform visual inspections or physical tests for each energy source. The November 29, 2023 updated version of the ECP included new steps to open valves and drain components, but did not include any verification steps. On October 24, 2023, a Metrology Technician received burn injuries from uncontrolled pressurized steam thermal energy while removing a pressure transmitter from this machine.