Violation Detail
Standard Cited: 19100269 D06 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1705593.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $16,131.00
Current Penalty: $12,098.25
Issuance Date: 03/12/2024
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 05/06/2024
Gravity: 10
Report ID: 0419700
Contest Date:
Final Order: 04/07/2024
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/07/2024 | $12,098.25 | 05/06/2024 | Serious | |
Penalty | Z: Issued | 03/12/2024 | $16,131.00 | 04/05/2024 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.269(d)(6)(ii): The machine or equipment was not turned off or shut down using the procedures established for the machine or equipment. An orderly shutdown was not used to avoid any additional or increased hazards to employees as a result of the equipment stoppage: a. At Florida Power and Light's Sunshine Solar Power Farm, located at 8690 Hogan Road in Live Oak Florida: On or about October 23, 2023, the employer exposed employees to electrical shock and burn hazards, in that the #10 inverter was not shut down using the employer's established procedures.