Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1695290.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,292.00
Current Penalty: $0.00
Issuance Date: 02/13/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/11/2024
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 03/06/2024
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/06/2024 | $0.00 | 03/11/2024 | Serious | |
| Penalty | Z: Issued | 02/13/2024 | $11,292.00 | 03/11/2024 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.416(a)(1): The employer permitted employees to work in close proximity to energized, unguarded, and ungrounded electric power circuits that the employee could contact in the course of their work: a) On or about September 1, 2023, in the Machining Building, employees were performing electrical work on 480-volt equipment that was energized and had the dead front open.
Translate