Violation Detail
Standard Cited: 19100219 C02 I Mechanical power-transmission apparatus.
Inspection Nr: 1694627.015
Citation: 01002B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/29/2023
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 12/26/2023
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 12/28/2023
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/28/2023 | $0.00 | 12/26/2023 | Other | |
Penalty | Z: Issued | 11/29/2023 | $0.00 | 12/26/2023 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.219(c)(2)(i): All exposed parts of horizontal shafting seven (7) feet or less from floor or working platform were not protected by stationary casings enclosing shafting completely or by troughs enclosing sides and top or sides and bottom of shafting: (a) Soup Packing Line - On the end where soup containers exited, the powered horizontal square shaft on the metal detector conveyor did not have guarding where the modular plastic belt ran over the shaft, and the shaft did not have guarding for several inches along both ends, exposing employees to hazards created by ingoing nip points and rotating parts, on or about August 22, 2023. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.