Violation Detail
Standard Cited: 19260451 G04 I General requirements.
This violation item has been deleted.
Inspection Nr: 1650905.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/21/2023
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0728900
Contest Date:
Final Order: 05/15/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/15/2023 | $0.00 | Serious | ||
Penalty | Z: Issued | 04/21/2023 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews. The employer was failing to protect employee(s) from fall injuries. This was most recently documented on or about February 15, 2023, at 3915 S. 210th Cir. Elkhorn, Nebraska. The employer failed to assure that all guardrails were to be installed along the open sides and ends of the mobile scaffold released to be used to prevent fall hazards.