Violation Detail
Standard Cited: 19100305 B01 Wiring methods, components, and equipment for general use.
Inspection Nr: 1647573.015
Citation: 01002B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/14/2023
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 09/15/2023
Gravity: 5
Report ID: 0521400
Contest Date:
Final Order: 08/07/2023
Related Event Code (REC): C
Emphasis:
Substance: 0420
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/07/2023 | $0.00 | 09/15/2023 | Other | |
Penalty | Z: Issued | 07/14/2023 | $0.00 | 08/21/2023 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.305(b)(1): Conductors entering boxes, cabinets, or fittings were not protected from abrasions, nor were openings through which conductors enter were effectively closed: (a) Green Waste Area - On or about February 1, 2023, the employer permitted the use of construction string lighting as a substitute for fixed lighting within the CONEX intermodal shipping container. Where the flexible power cord entered a wall mounted outlet box, strain relief, fittings, or other protections against abrasion were not implemented, thereby exposing employees to shock hazards. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).