Violation Detail
Standard Cited: 19261204 C
Inspection Nr: 1596505.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/30/2022
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 02/01/2023
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 11/15/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/15/2022 | $0.00 | 02/01/2023 | Serious | |
Penalty | Z: Issued | 09/30/2022 | $0.00 | 10/27/2022 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.1204(c): The employer did not develop and implement the means, procedures, and practices necessary for safe permit space entry operations, including, but not limited to, those specified in subparagraphs �1926.1204(c)(1) through �1926.1204(c)(8): a) At the jobsite, where employees entered storm water lines, the permit program developed and implemented did not specify acceptable entry conditions; did not contain the procedures for observation of monitoring by employees; did not contain the procedures to isolate the storm water lines; did not contain the procedures for purging, inerting, flushing and ventilating the storm water lines; did not contain the procedures for emergency exit of the storm water lines if the ventilation failed; did not contain the procedures for protecting the storm water lines from pedestrians and vehicles; did not contain the procedures for continuous monitoring; and did not contain the precautions for the removal of the manhole cover, exposing employees to inhalation and engulfment hazards.