Violation Detail
Standard Cited: 19100269 D02 VIII A Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1591289.015
Citation: 01002B
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/06/2022
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/01/2022
Gravity: 10
Report ID: 0112300
Contest Date: 10/31/2022
Final Order: 06/12/2023
Related Event Code (REC): I;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 06/12/2023 | $0.00 | 11/01/2022 | Serious | |
| Penalty | C: Contested | 11/01/2022 | $0.00 | 11/01/2022 | Serious | |
| Penalty | Z: Issued | 10/06/2022 | $0.00 | 11/01/2022 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.269(d)(2)(viii)(A): Retraining was not provided for all authorized and affected employees whenever there was a change in their job assignments, a change in machines, equipment, or processes that present a new hazard or whenever there is a change in the energy control procedures. (a) Manchester Street Station - Generator #10: On or about 4/21/2022, the employer did not retrain, notify or brief employees that a change in energy control procedures had occurred while they were servicing power generation equipment.