Standard Cited: 19100147 C02 III The control of hazardous energy (lockout/tagout).
Inspection Nr: 1576576.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/02/2022
Nr Instances: 2
Nr Exposed: 6
Abatement Date:
Gravity: 5
Report ID: 0213400
Contest Date:
Final Order: 08/26/2022
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/26/2022 | $0.00 | Serious | ||
| Penalty | Z: Issued | 08/02/2022 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.147(c)(2)(iii):New machines and equipment that were installed after January 2, 1990 were not provided with energy isolating devices designed to accept lockout devices: a) Press floor area of Production, Exothermic Molding, Inc., 50 Lafayette Place, Kenilworth, NJ 07033; On or about 2/02/2022, electrical disconnects capable of accepting lockout devices were not provided on hydraulic injection molding presses #5 and #6 for energy isolation when operator(s) and/or mechanic(s) perform service & maintenance work. During service such as plastic "flash" residue removal by hand from plate surface, operator(s) have arms/hands, and often whole body, between the press jaws while the machine is energized.