Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1529339.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/17/2021
Nr Instances: 5
Nr Exposed: 21
Abatement Date: 12/15/2021
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 09/08/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/08/2021 | $0.00 | 12/15/2021 | Serious | |
Penalty | Z: Issued | 08/17/2021 | $0.00 | 10/04/2021 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. a) On or about May 6, 2021, the employer did not conduct a periodic inspection to address the inadequacies of the lockout procedures for the machines present at the facility. These machines include but were not limited to the Lite Machine, Diehl 55 Rip Saw, Challoner 723 Tenoner Trim Saw, Tyler Power Pod Cold Press #1, and the Panel Saw Across From West Entrance Door.