Violation Detail
Standard Cited: 19100219 C02 I Mechanical power-transmission apparatus.
Inspection Nr: 1501736.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 03/18/2021 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/22/2021
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 03/18/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/18/2021 | $0.00 | 03/18/2021 | Serious | |
Penalty | Z: Issued | 02/22/2021 | $0.00 | 03/18/2021 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.219(c)(2)(i): All exposed parts of horizontal shafting seven (7) feet or less from floor or working platform were not protected by stationary casings enclosing shafting completely or by troughs enclosing sides and top or sides and bottom of shafting: (a) Can Line 2 Cepak TX1 automatic can body blank feeder - Employees working on the slitter side were exposed to caught-in or caught-by moving machine parts from rotating horizontal head shaft, on or about November 2, 2020. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.