Violation Detail
Standard Cited: 19260454 B02 Training requirements.
This violation item has been deleted.
Inspection Nr: 1500537.015
Citation: 01002B
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/30/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/20/2021
Gravity: 10
Report ID: 0317300
Contest Date:
Final Order: 05/26/2021
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/26/2021 | $0.00 | 05/20/2021 | Serious | |
| Penalty | Z: Issued | 04/30/2021 | $0.00 | 05/20/2021 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.454(b)(2): The correct procedures for erecting, disassembling, moving, operating, repairing, inspecting, and maintaining the type of scaffold in question; a) 39602 Waterworks Court Bethany Beach, DE - On or about November 2020, the employer did not provide instructions or training to their employees on how to identify and avoid hazardous conditions applicable to their work environment, including but not limited to ground conditions and wind limits of the Genie Z-135/70 model aerial lift which was used on site to facilitate the antenna work and resulted in 2 fatal injuries.
Translate