Violation Detail
Standard Cited: 19100147 D06 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1486925.015
Citation: 01002B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/01/2021
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 06/03/2021
Gravity: 1
Report ID: 0627500
Contest Date: 02/23/2021
Final Order: 06/03/2021
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 06/03/2021 | $0.00 | 06/03/2021 | Other | |
| Penalty | C: Contested | 03/01/2021 | $0.00 | 02/16/2021 | Serious | |
| Penalty | Z: Issued | 02/01/2021 | $0.00 | 02/16/2021 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.147(d)(6):Verification of isolation. Prior to starting work on machines or equipment that have been locked out or tagged out, the authorized employee shall verify that isolation and deenergization of the machine or equipment have been accomplished. Stateline Plant: On or about August 4, 2020 prior to starting work on the stabilizer unit the employer did not verify isolation and deenergization of equipment. This condition exposed employees to a fire hazard.