Standard Cited: 19260451 H01 General requirements.
This violation item has been deleted.
Inspection Nr: 1426362.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 10/31/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/04/2019
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 1032500
Contest Date:
Final Order: 11/15/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/15/2019 | $0.00 | 10/31/2019 | Serious | |
Penalty | Z: Issued | 10/04/2019 | $0.00 | 10/31/2019 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.451(h)(1): In addition to wearing hardhats, each employee on a scaffold was not provided with additional protection from falling hand tools, debris, and other small objects through the installation of toeboards, screens, guardrail systems, or through the erection of debris nets, catch platforms, or canopy structures that contained or deflected the falling objects: (a) On or about August 20, 2019, an employee was elevated in a aerial lift while involved in the truss installation process and did not have a protective helmet. NOTE: Abatement certification IS required for this item.