Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1381418.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/22/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 04/17/2019
Gravity: 10
Report ID: 0627510
Contest Date:
Final Order: 04/16/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/16/2019 | $0.00 | 04/17/2019 | Serious | |
| Penalty | Z: Issued | 03/22/2019 | $0.00 | 04/17/2019 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) At the construction site, where the working level of tubular welded frame scaffolding was not fully decked between the uprights.
Translate