Violation Detail
Standard Cited: 19100218 A02 II Forging machines.
This violation item has been deleted.
Inspection Nr: 1358338.015
Citation: 01002B
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/26/2018
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 02/08/2019
Gravity: 5
Report ID: 0524500
Contest Date:
Final Order: 01/17/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/17/2019 | $0.00 | 02/08/2019 | Serious | |
Penalty | Z: Issued | 12/26/2018 | $0.00 | 02/08/2019 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.218(a)(2)(ii): There were no scheduled and recorded inspections of guards and point of operation protection devices at frequent and regular intervals for forging machine(s): On or about November 5, 2018, employees were exposed to entanglement hazards and the employer did not schedule and record the inspection of guards and point of operation protection for the Bronx Tube Straightener (Model 2 13750) which included the following: a. date of inspection; b. signature of the inspector; and c. serial number/other identifier.