Violation Detail
Standard Cited: 19100027 B02 V Scaffolds and rope descent systems.
Inspection Nr: 1338252.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/14/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 02/01/2019
Gravity: 10
Report ID: 0111500
Contest Date:
Final Order: 12/03/2018
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/03/2018 | $0.00 | 02/01/2019 | Serious | |
Penalty | Z: Issued | 11/14/2018 | $0.00 | 11/20/2018 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.27(b)(2)(v): The employer did not ensure that the rope descent system had proper rigging, including anchorages and tiebacks, with particular emphasis on providing tiebacks when counterweights, cornice hooks, or similar non-permanent anchorages were used; Jobsite: The employer did not ensure that the rope descent system had the proper rigging, including anchorages and tiebacks. On 25 June 2018, an employee fell approximately 60 feet to the ground from the roof and sustained several broken bones from the incident. The employee was transported to a hospital after the incident.