Violation Detail
Standard Cited: 19100269 N02 Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1313494.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/24/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 09/20/2018
Gravity: 10
Report ID: 0627510
Contest Date: 09/19/2018
Final Order: 05/04/2020
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 05/04/2020 | $0.00 | 09/20/2018 | Serious | |
| Penalty | C: Contested | 09/20/2018 | $0.00 | 09/20/2018 | Serious | |
| Penalty | Z: Issued | 08/24/2018 | $0.00 | 09/20/2018 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.269(n)(2): For any employee to work transmission and distribution lines or equipment as deenergized, the employer did not ensure that the lines or equipment were deenergized under the provisions of paragraph (m) of this section and did not ensure proper grounding of the lines or equipment as specified in paragraphs (n)(3) through (n)(8) of this section: On or about May 2, 2018, employees performing repair work on an overhead power line were exposed to electrical hazards when the employer did not ensure proper grounding of the lines.