Violation Detail
Standard Cited: 19100305 D02 Wiring methods, components, and equipment for general use.
Inspection Nr: 1292843.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/31/2018
Nr Instances: 24
Nr Exposed: 30
Abatement Date: 10/25/2018
Gravity: 10
Report ID: 1032700
Contest Date:
Final Order: 08/21/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/21/2018 | $0.00 | 10/25/2018 | Serious | |
Penalty | Z: Issued | 07/31/2018 | $0.00 | 10/25/2018 | Willful |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.305(d)(2): Panelboards were not mounted in cabinets, cutout boxes, or enclosures approved for the purpose and were not dead front. (a) M/V Matanuska - Car Deck - On or about February 2nd, 2018 and at times prior thereto, employees were exposed to electrical hazards that would result in cardiac arrest, severe burns and death while connecting or disconnecting wiring in the circuit breakers of the temporary load centers. The missing dead fronts were located on the 100A, 480VAC and 30A, 480VAC GE TE100R Mod. 8 type 3R circuit breaker enclosures.