Violation Detail
Standard Cited: 19100179 J01 I Overhead and gantry cranes.
Inspection Nr: 1250054.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/26/2017
Nr Instances: 1
Nr Exposed: 40
Abatement Date:
Gravity: 5
Report ID: 0317900
Contest Date: 10/17/2017
Final Order: 01/22/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 01/22/2018 | $0.00 | Serious | ||
| Penalty | C: Contested | 10/17/2017 | $0.00 | Serious | ||
| Penalty | Z: Issued | 09/26/2017 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.179(j)(1)(i): Prior to initial use, all new and altered cranes were not inspected to insure compliance with the provisions of 29 CFR 1910.179(j). a) 2027 S. 12th St. Building 507, Allentown, PA - on or about June 7, 2017, employees were lifting metal with a 7.5 Ton crane, which had not been inspected prior to use.