Violation Detail
Standard Cited: 19100146 D04 I Permit-required confined spaces
Inspection Nr: 1217731.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 12/21/2018 2
Initial Penalty: $12,675.00
Current Penalty: $0.00
Issuance Date: 08/14/2017
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 10
Report ID: 0112600
Contest Date: 09/12/2017
Final Order: 11/21/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/21/2018 | $0.00 | 12/21/2018 | Serious | |
Penalty | C: Contested | 09/12/2017 | $12,675.00 | 09/08/2017 | Serious | |
Penalty | Z: Issued | 08/14/2017 | $12,675.00 | 09/08/2017 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.146(d)(4)(i): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not provide, at no cost to the employees, testing and monitoring equipment needed to comply with 29 CFR 1910.146(d)(5): Tertiary, boiler#1, 188 Main Street, Agawam, MA: On or about March 15, 2017 the employer had not provided a thermal measuring device to monitor ash temperature during the vacuuming process which exposes hot ash capable of engulfing and burning employees. Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1).