Violation Detail
Standard Cited: 19100146 D03 Permit-required confined spaces
Inspection Nr: 1211909.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 08/28/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/02/2017
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 08/22/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/22/2017 | $0.00 | 08/28/2017 | Serious | |
Penalty | Z: Issued | 08/02/2017 | $0.00 | 08/28/2017 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.146(d)(3): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not develop and implement the means, procedures, and practices necessary for safe permit space entry operations: a) On or about February 17, 2017 and at times prior thereto, at the Unit 1 Preheater Alpha Crossover Duct, the employer did not developed safe entry procedures for employees working and replacing an expansion joint.