Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1210687.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 05/12/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/02/2017
Nr Instances: 1
Nr Exposed: 23
Related Event Code (REC):
Gravity: 10
Report ID: 0522500
Contest Date: 05/26/2017
Final Order: 02/15/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/15/2018 | $0.00 | 05/12/2017 | Serious | |
Penalty | C: Contested | 06/02/2017 | $0.00 | 05/12/2017 | Serious | |
Penalty | Z: Issued | 05/02/2017 | $0.00 | 05/12/2017 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. a. Located at the workplace: the employer did not ensure that a periodic inspection of the Slitter 1 energy control procedure was performed in order to correct the deviations and inadequacies of the procedure, such as, but not limited to, employees utilizing the established written procedure, means and methods to dissipate stored hydraulic energy, and means and methods to control the pneumatic and gravity energy sources.