Standard Cited: 19100119 L04 Process safety management of highly hazardous chemicals.
Inspection Nr: 1150653.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/10/2016
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 03/01/2017
Gravity: 10
Report ID: 0134000
Contest Date:
Final Order: 12/06/2016
Related Event Code (REC):
Emphasis:
Substance: 0170
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/06/2016 | $0.00 | 03/01/2017 | Serious | |
Penalty | Z: Issued | 11/10/2016 | $0.00 | 12/16/2016 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.119(l)(4): A change covered by this paragraph was made requiring an update to the process safety information required by paragraph (d) of this section, and that information was not updated: (a) Location - 262 Primrose Street, Haverhill, MA: On or about 5/26/2016, process safety information concerning materials of construction was not updated to reflect the installation of flexible metal piping in the Primrose Engine Room.