Violation Detail
Standard Cited: 19150181 B Electrical circuits and distribution boards.
This violation item has been deleted.
Inspection Nr: 1135082.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 06/27/2016
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/27/2016
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): C
Gravity: 10
Report ID: 0521100
Contest Date:
Final Order: 06/20/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/20/2016 | $0.00 | 06/27/2016 | Serious | |
Penalty | Z: Issued | 05/27/2016 | $0.00 | 06/27/2016 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1915.181(b): Before an employee was permitted to work on an electrical circuit, except when the circuit must remain energized for testing and adjusting, the circuit was not de-energized and checked at the point at which the work was done to ensure that it was actually de-energized. (a) On or about March 14, 2016; in CSER 4 located on the LCS 9; employees did not verify deenergization prior to installing the front plane on the SSABT (Solid State Automatic Bus Transfer) exposing employees to electrical shock hazards.