Violation Detail
Standard Cited: 19100146 D02 Permit-required confined spaces
Inspection Nr: 1123560.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $2,000.00
Issuance Date: 07/29/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/17/2016
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 08/19/2016
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/19/2016 | $2,000.00 | 10/17/2016 | Serious | |
| Penalty | Z: Issued | 07/29/2016 | $0.00 | 08/17/2016 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.146(d)(2): Under the permit space program required by paragraph (c)(4) of this section, the employer did not identify and evaluate the hazards of permit spaces before employees enter them. a) Ductile Muller - On February 8, 2016 and times prior the employer failed to identify and evaluate all hazards associated with the Ductile Muller. Specifically, the company failed to identify and evaluate the batch hopper air supply as an energy source required to be controlled. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate