Violation Detail
Standard Cited: 19100305 G01 IV Wiring methods, components, and equipment for general use.
Inspection Nr: 1113822.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/05/2016
Nr Instances: 1
Nr Exposed: 15
Abatement Date: 05/17/2016
Gravity: 1
Report ID: 0418200
Contest Date:
Final Order: 06/01/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | A: Amendment | 11/08/2016 | $0.00 | 05/17/2016 | Serious | |
Penalty | I: Informal Settlement | 06/01/2016 | $0.00 | 05/17/2016 | Serious | |
Penalty | Z: Issued | 05/05/2016 | $0.00 | 05/17/2016 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.305(g)(1)(iv): Flexible cords and/ or cables were used for purposes prohibited by paragraphs (A) through (F) of 29 CFR 1910.305(g)(1)(iv) (a) Throughout the building area: On or about 12/22/2016 and at times thereto, the employer exposed employees to electrical shock and fire hazards, in that; flexible cords being used to power portable tools were running through the ceiling, attached to work benches, and the building structure. Flexible cords were being used as a substitute for fixed wiring.