Violation Detail
Standard Cited: 19260251 A06 Rigging equipment for material handling.
Inspection Nr: 1112039.015
Citation: 01002B
Citation Type: Other
Abatement Date: 06/03/2016 5
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/25/2016
Nr Instances: 2
Nr Exposed: 1
Related Event Code (REC):
Gravity:
Report ID: 0111500
Contest Date:
Final Order: 06/22/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/22/2016 | $0.00 | 06/03/2016 | Other | |
Penalty | Z: Issued | 05/25/2016 | $0.00 | 06/03/2016 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.251(a)(6): Each day before being used, and during use, where service conditions warrant, the sling and all fastenings and attachments were not inspected for damage or defects by a competent person, and damaged or defective slings were not immediately removed from service: WORKSITE: The two (2) synthetic web slings, used by employees to lift and carry bundles of rebar using the bucket of the Kobelco Model SK160LC hydraulic excavator were not inspected by a competent person for excessive wear and damage prior to use.