Violation Detail
Standard Cited: 19260416 A03 General requirements.
Inspection Nr: 1107873.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/29/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/31/2016
Gravity: 10
Report ID: 0316400
Contest Date:
Final Order: 05/20/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/20/2016 | $0.00 | 05/31/2016 | Serious | |
Penalty | Z: Issued | 04/29/2016 | $0.00 | 05/11/2016 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.416(a)(3): Before work began, the employer did not ascertain by inquiry, direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work could bring any person, tool, or machine into physical or electrical contact with the electric power circuit. (a) Locust Avenue: On or about November 17, 2015 and times prior, the employer did not determine whether the erection of the aluminum ladder jack scaffold, employees performing the work, and tools could contact the 3 wire open service 120v-240v energized electrical residential power line and weather head to the 8 unit apartment complex.