Violation Detail
Standard Cited: 19100269 D02 IV D Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1102415.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $12,000.00
Issuance Date: 04/26/2016
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 06/13/2016
Gravity: 10
Report ID: 0418200
Contest Date: 05/16/2016
Final Order: 03/31/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/31/2017 | $12,000.00 | 06/13/2016 | Serious | |
Penalty | C: Contested | 05/20/2016 | $0.00 | 06/13/2016 | Serious | |
Penalty | Z: Issued | 04/26/2016 | $0.00 | 06/13/2016 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.269(d)(2)(iv)(D): Specific requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures. a. Plant Bowen, JBR 3/4 Building, Buss B - The tagout procedure used to isolate Frames 1 and 1A and render the equipment safe, did not include specific techniques and methods necessary for checking and verifying the absence of voltage on the equipment and for the hanging of temporary protective grounding cables.