Violation Detail
Standard Cited: 19260451 F07 General requirements.
Inspection Nr: 992816.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 10/09/2014 2
Initial Penalty: $2,000.00
Current Penalty: $1,400.00
Issuance Date: 09/15/2014
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 5
Report ID: 0111500
Contest Date:
Final Order: 10/10/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/10/2014 | $1,400.00 | 10/09/2014 | Serious | |
Penalty | Z: Issued | 09/15/2014 | $2,000.00 | 10/09/2014 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person. Worksite: The metal frame scaffold that employees were working from at a height above 10 feet was not erected under the supervision of a person competent in scaffold erection.