Violation Detail
Standard Cited: 19260502 D09 Fall protection systems criteria and practices.
Inspection Nr: 977408.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,000.00
Current Penalty: $1,000.00
Issuance Date: 10/20/2014
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 5
Report ID: 0418800
Contest Date:
Final Order: 11/12/2014
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/12/2014 | $1,000.00 | Serious | ||
| Penalty | Z: Issued | 10/20/2014 | $2,000.00 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.502(d)(9): Lanyards and/or vertical lifelines did not have a minimum breaking strength of 5,000 pounds (22.2 kN): a. On or about May 5, 2014 at the above addressed jobsite, employees were using a vertical lifeline(s), which were tied-off/around a roof-top cupola, using a knot, resulting in the reduction of the lifeline by 50 percent or more.