Violation Detail
Standard Cited: 19261408 A02
Inspection Nr: 971090.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 08/08/2014 2
Initial Penalty: $4,900.00
Current Penalty: $2,940.00
Issuance Date: 08/04/2014
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0625400
Contest Date:
Final Order: 08/18/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/18/2014 | $2,940.00 | 08/08/2014 | Serious | |
Penalty | Z: Issued | 08/04/2014 | $4,900.00 | 08/08/2014 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.1408(a)(2): The equipment's maximum working radius could get closer than 20 feet to a power line and the employer did not meet the requirements in Option (1), Option (2), or Option (3) of this section. On 21 April 2014, and at times prior thereto, a rough terrain crane with a boom arm was allowed to operate near and under an energized power line, exposing the operator and co-workers nearby to an electrical hazard of approximately 25 kV 3-phase. The employer did not have the line de-energized or grounded (Option 1); did not maintain a 20 foot clearance (Option 2); or follow the minimum clearance distance per Table A as at least 10 feet for 25 kV (Option 3).