Violation Detail
Standard Cited: 19100219 D01 Mechanical power-transmission apparatus.
Inspection Nr: 957509.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 03/09/2015 2
Initial Penalty: $4,675.00
Current Penalty: $4,675.00
Issuance Date: 06/24/2014
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): C
Gravity: 5
Report ID: 0728900
Contest Date: 07/11/2014
Final Order: 04/27/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/27/2015 | $4,675.00 | 03/09/2015 | Serious | |
Penalty | C: Contested | 07/15/2014 | $4,675.00 | 07/21/2014 | Serious | |
Penalty | Z: Issued | 06/24/2014 | $4,675.00 | 07/21/2014 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): At Gavilon Grain, LLC 2213 23rd Avenue, Nebraska City, NE: The employer failed to ensure that the pulley on the alternator of the New Idea Uniloader was fully enclosed with an acceptable guard as required by section (m) and (o).