Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 92160.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,200.00
Current Penalty: $2,100.00
Issuance Date: 08/17/2011
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 08/18/2011
Gravity: 10
Report ID: 0521700
Contest Date:
Final Order: 09/01/2011
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/01/2011 | $2,100.00 | 08/18/2011 | Serious | |
| Penalty | Z: Issued | 08/17/2011 | $4,200.00 | 08/18/2011 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports: a. On or about June 14, 2011, at the above addressed jobsite, an employee was exposed to falls from a tubular welded frame scaffold which had a 19 inch wide work platform.
Translate