Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 918042.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 01/07/2014 2
Initial Penalty: $7,000.00
Current Penalty: $4,900.00
Issuance Date: 12/10/2013
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0418400
Contest Date:
Final Order: 02/03/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/03/2014 | $4,900.00 | 01/07/2014 | Serious | |
Penalty | Z: Issued | 12/10/2013 | $7,000.00 | 01/07/2014 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.107(b)(5)(i): The spraying operations were not designed, installed or maintained so that the average air velocity over the open face of the booth (or booth cross section during spraying operations) were equal to or greater than 100 linear feet per minute. (a) In the Plant 4 center spray booth, on July 17, 2013 and at times prior to, average air velocity at the booth cross section was not equal to or greater than 100 linear feet per minute, exposing employees to a fire hazard. (b) In the Plant 4 south spray booth, on July 17, 2013 and at times prior to, average air velocity at the booth cross section was not equal to or greater than 100 linear feet per minute, exposing employees to a fire hazard.