Violation Detail
Standard Cited: 19100179 J02 Overhead and gantry cranes.
Inspection Nr: 915420.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,300.00
Current Penalty: $3,780.00
Issuance Date: 12/13/2013
Nr Instances: 10
Nr Exposed: 60
Abatement Date: 01/14/2014
Gravity: 10
Report ID: 0636900
Contest Date:
Final Order: 12/26/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/26/2013 | $3,780.00 | 01/14/2014 | Serious | |
| Penalty | Z: Issued | 12/13/2013 | $6,300.00 | 01/14/2014 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.179(j)(2): The following items were not be inspected for defects at intervals as defined in paragraph (j)(1)(ii) of this section or as specifically indicated, including observation during operation for any defects which might appear between regular inspections: On or about June 27, 2013, the employer did not perform monthly or daily crane inspections on any of the overhead cranes that includes but not limited to, exposure to wear, deterioration, or malfunction of the critical components of the cranes. Employees were exposed to struck by and overhead hazards from falling loads due to crane failure. a) 10 Ton, Gaffey, located in the Union Hall b) 2 Ton, Anchor, located in the Class A, South Welding Area c) 2 Ton, Anchor, located in the Main Building, North end of Welding d) 2 Ton, Gaffey, located in the Main Building, Middle Bay, South e) 2 Ton, Gaffey, located in the Main Building, Middle Bay, North f) 5 Ton, Gaffey, located in the Main Building, Department #50, A-Line g) 10 Ton, Gaffey, located in the Main Building, Department #50, A-Line h) 2 Ton, Coffey, located in the Main Building, Foam South i) 3 Ton, Gaffey, located in the Main Building, Foam North j) 3 Ton, Gaffey, located in the Main Building, Department #50, A-Line