Violation Detail
Standard Cited: 19260451 D12 I General requirements.
Inspection Nr: 768903.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 06/04/2013
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/28/2013
Gravity: 10
Report ID: 0317900
Contest Date:
Final Order: 06/17/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/17/2013 | $7,000.00 | 06/28/2013 | Serious | |
| Penalty | Z: Issued | 06/04/2013 | $7,000.00 | 06/28/2013 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.451(d)(12)(i): A single point suspension scaffold did not have a minimum of 3 wire rope clips installed: a) Water Tower, Suspended Scaffold - On or about December 5, 2012, employees were working on a single point New England Boom suspension scaffold when the upper loop of its 'cable eye' suspension line failed, causing the scaffolding to collapse, as the wire rope was inadequately secured with only a single Crosby fist grip clip and a single Crosby U-Bolt wire rope clip.
Translate