Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 313516031
Citation: 01002A
Citation Type: Serious
Abatement Status: X
Initial Penalty: $1,250.00
Current Penalty: $1,250.00
Issuance Date: 01/06/2010
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 01/19/2010
Gravity: 03
Report ID: 0111500
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate