Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 313433716
Citation: 01002A
Citation Type: Serious
Abatement Status: I
Initial Penalty: $3,000.00
Current Penalty: $1,500.00
Issuance Date: 06/21/2012
Nr Instances: 3
Nr Exposed: 10
Abatement Date: 06/26/2012
Gravity: 05
Report ID: 0215600
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/05/2012 | $1,500.00 | 06/26/2012 | Serious | |
| Penalty | Z: Issued | 06/21/2012 | $3,000.00 | 06/26/2012 | Serious |