Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 313429029
Citation: 01002A
Citation Type: Serious
Abatement Date: 02/23/2011 I
Initial Penalty: $4,200.00
Current Penalty: $2,940.00
Issuance Date: 02/18/2011
Nr Instances: 5
Nr Exposed: 21
Related Event Code (REC): C
Gravity: 10
Report ID: 0215600
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/07/2011 | $2,940.00 | 02/23/2011 | Serious | |
Penalty | Z: Issued | 02/18/2011 | $4,200.00 | 02/23/2011 | Serious |