Violation Detail
Standard Cited: 19100119 C01 Process safety management of highly hazardous chemicals.
Inspection Nr: 313419145
Citation: 01002A
Citation Type: Serious
Abatement Status: X
Initial Penalty: $5,000.00
Current Penalty: $3,500.00
Issuance Date: 11/17/2010
Nr Instances: 1
Nr Exposed: 7
Abatement Date: 02/22/2011
Gravity: 10
Report ID: 0830500
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | P: Petition to Mod Abatement | 03/01/2011 | $3,500.00 | 02/22/2011 | Serious | |
| Penalty | I: Informal Settlement | 11/30/2010 | $3,500.00 | 01/14/2011 | Serious | |
| Penalty | Z: Issued | 11/17/2010 | $5,000.00 | 12/20/2010 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard: CHEMNEP
29 CFR 1910.119(c)(1) The employer did not develop a written plan of action regarding the implementation of the employee participation required by this paragraph: (a)Styro-Tech LLC at 5005 Lima St., Denver, CO 80239: On and before May 18, 2010 the employer did not develop a written plan of action regarding the implementation of the employee participation required by the process safety management (PSM) standard. Abatement Note: Abatement certification and documentation are required for this item (see enclosed "Sample Abatement Certification Letter").
Translate