Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 310149737
Citation: 01002A
Citation Type: Serious
Abatement Status: I
Initial Penalty: $3,000.00
Current Penalty: $1,800.00
Issuance Date: 11/30/2007
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/05/2007
Gravity: 10
Report ID: 0213400
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/21/2007 | $1,800.00 | 12/05/2007 | Serious | |
| Penalty | Z: Issued | 11/30/2007 | $3,000.00 | 12/05/2007 | Serious |
Translate