Violation Detail
Standard Cited: 19100036 A01 Design and construction requirements for exit routes.
Inspection Nr: 307952051
Citation: 01002A
Citation Type: Serious
Abatement Status: X
Initial Penalty: $2,800.00
Current Penalty: $1,800.00
Issuance Date: 09/19/2005
Nr Instances: 1
Nr Exposed: 23
Abatement Date: 10/06/2005
Gravity: 05
Report ID: 0625400
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/11/2005 | $1,800.00 | 10/06/2005 | Serious | |
Penalty | Z: Issued | 09/19/2005 | $2,800.00 | 10/06/2005 | Serious |