Violation Detail
Standard Cited: 19100036 B02 Design and construction requirements for exit routes.
Inspection Nr: 304991060
Citation: 01002A
Citation Type: Serious
Abatement Status: X
Initial Penalty: $2,500.00
Current Penalty: $2,500.00
Issuance Date: 07/28/2003
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 09/02/2003
Gravity: 03
Report ID: 0112300
Contest Date:
Final Order:
Related Event Code (REC): R
Emphasis:
Translate