Violation Detail
Standard Cited: 95012901
Inspection Nr: 304491400
Citation: 01002A
Citation Type: Serious
Abatement Status: X
Initial Penalty: $175.00
Current Penalty: $113.75
Issuance Date: 05/23/2001
Nr Instances: 10
Nr Exposed: 1
Abatement Date: 07/31/2001
Gravity:
Report ID: 0453730
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | P: Petition to Mod Abatement | 07/25/2001 | $113.75 | 07/31/2001 | Serious | |
| Penalty | I: Informal Settlement | 07/11/2001 | $113.75 | 07/10/2001 | Serious | |
| Penalty | Z: Issued | 05/23/2001 | $175.00 | 07/10/2001 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard: UNAPOPPROC
North Carolina General Statute 95-129(1) of the Occupational Safety and Health Act of North Carolina: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: a)facility; throughout such as steel room - monorail system has not had frequent and periodic inspection. REFERENCE: ANSI B30.11-1998; 11-2.1.1 Inspection (a) Prior to initial use, all new, reinstalled, altered, or modified crane and monorail systems shall be inspected...(b) on a frequent and periodic basis. NOTE: One acceptable and feasible means of abatement is to have the monorail systems inspected on a frequent and periodic inspection.