Violation Detail
Standard Cited: 19100107 B01 Spray finishing using flammable and combustible materials.
Inspection Nr: 1860460.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $9,268.00
Current Penalty: $5,560.80
Issuance Date: 04/24/2026
Nr Instances: 1
Nr Exposed: 10
Abatement Date:
Gravity: 10
Report ID: 0728500
Contest Date:
Final Order: 05/26/2026
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/26/2026 | $5,560.80 | Serious | ||
| Penalty | Z: Issued | 04/24/2026 | $9,268.00 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.107(b)(1):The spray booth was not substantially constructed of steel, securely and rigidly supported, or of concrete or masonry. At the work site located at 2401 Southwest Parkway St. Joseph Missouri: Employees were exposed to fire and chemical hazards. A spray booth made of a cloth tent was used to apply polyurethane paints daily over a one to three year period.