Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 1843232.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $5,958.00
Current Penalty: $2,979.00
Issuance Date: 08/26/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/14/2025
Gravity: 10
Report ID: 0524500
Contest Date:
Final Order: 09/16/2025
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/16/2025 | $2,979.00 | 10/14/2025 | Serious | |
| Penalty | Z: Issued | 08/26/2025 | $5,958.00 | 09/05/2025 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6): On or about August 12, 2025, an employee was exposed to electrical hazards, while working from an aerial lift closer than 10 feet to uninsulated electrical lines less than 50 kv, on a commercial construction site in Peoria, Illinois.